Report ID: 22-642   
Type: Consent
Meeting Body: Board of Directors - Regular Meeting
Meeting Date: 12/14/2022 Final action: 12/14/2022
Recommended Action: Consider approving the award of a contract to MarinShip Development Interest, LLC (of San Francisco) for the installation of a stormwater bioswale at the San Leandro Transit Center/San Leandro BART Station/BRT Southern Terminus. Staff Contact: Ramakrishna Pochiraju, Executive Director of Planning & Engineering
Attachments: 1. STAFF REPORT, 2. Master Minute Order

TO:                     AC Transit Board of Directors                                          

FROM:                                             Michael A. Hursh, General Manager/Chief Executive Officer

SUBJECT:                     Construction Contract Award                     

 

ACTION ITEM

AGENDA PLANNING REQUEST:   


RECOMMENDED ACTION(S):

 

Title

Consider approving the award of a contract to MarinShip Development Interest, LLC (of San Francisco) for the installation of a stormwater bioswale at the San Leandro Transit Center/San Leandro BART Station/BRT Southern Terminus.

 

Staff Contact:

Ramakrishna Pochiraju, Executive Director of Planning & Engineering

Body                                          

STRATEGIC IMPORTANCE:

 

Goal - Environmental Improvement

Initiative - Infrastructure Modernization

 

The installation of this stormwater treatment bioswale project was a condition of the BART permit to upgrade the San Leandro Transit Center to accommodate the East Bay BRT line at the system’s southern terminus.  The installation of this bioswale ensures BART compliance with the existing Municipal Separate Storm Sewer System (MS4) compliance permit.

 

BUDGETARY/FISCAL IMPACT:

 

The contract will be funded by a combination of Low Carbon Transit Operations Program (LCTOP) state funds and District funds.

 

BACKGROUND/RATIONALE:

 

In July of 2019, BART issued ‘Permit to Enter’ which approved the construction modifications to the intermodal area to accommodate the East Bay BRT line and to construct an Operator Breakroom/Restroom.  The permit required, among other conditions, that AC Transit construct new bioswale improvements in the BART parking area to treat surface water per the BART MS4 permit.  This permit requirement was further codified in the Maintenance Agreement executed July 21, 2022, confirming AC Transit’s continued use of the Intermodal and Operator Breakroom.  The Maintenance Agreement established a required construction completion date of June 30, 2023, for the MS4 permit compliance issues.

 

The size and the water treatment volume of the bioswale were determined by the quantity of impervious surfaces installed by the intermodal upgrade project. BART and AC Transit collaboratively determined that the best locations would be two (2) slender bioswale strips along San Leandro Boulevard, south of the intermodal area, one north of Parrott Drive and one south of Parrott Drive.  These two areas will collectively satisfy the requirements of the existing MS4 permit.

 

This fixed price construction contract was procured using the standard Invitation for Bid (IFB) process.  The District received four (4) timely bids that were all deemed to be both responsive and responsible.  The bid amounts ranged within 25% from the lowest to the highest establishing a clear competitive range.  The Bids were:

 

Construction Bidder                                                                Grand                      Total Bid                     Variance from Low Bid

Marinship Development Interest, LLC                     $748,317                                            0%

MacGuire & Hester                                                                                    $821,000                                          10%

Bay Construction                                                                                    $843,000                                          13%

Ray’s Electric                                                                                                         $944,919                                          25%

 

The bid form for MarinShip Development Interest, LLC indicated an SBE/DBE participation of 78% which exceeds the project goal of 15%.

 

Procurement Timeline:

Issue for Bid (IFB)                                           10/04/2022

Pre-Bid Conferences                                           10/13/2022 and 10/24/2022

Bid Opening                                                                11/14/2022

 

ADVANTAGES/DISADVANTAGES:

 

The installation of these bioswales at the San Leandro Transit Center will complete the transformation of the transit center into the BRT Southern Terminus.  These bioswales will ensure site compliance with permit requirements.  Completion of these MS4 mitigation measures are required for the continued use of the Intermodal and the Operator Breakroom.  Staff did not identify any disadvantages to implementing the bioswale improvements.

 

ALTERNATIVES ANALYSIS:

 

Deferring these improvements into a future fiscal year is not recommended because the requirements exist in both the original permit and the maintenance agreement with BART.  Delaying or cancelling these improvements may risks AC Transit use of the Intermodal and/or the Operator’s Breakroom.

 

PRIOR RELEVANT BOARD ACTION/POLICIES:

 

SR 15-210 - Authorization to Advertise the Invitation for Bid (IFB)

SR 15-210a - Award IFB 2016-1354 Infrastructure and Station Platform Construction

Board Policy 465 - Procurement

 

ATTACHMENTS:

 

None

 

Prepared by:

Joe Callaway, Director of Capital Projects

 

In Collaboration with:

Michael Hass, Senior Project Manager

Evelyn Ng, Capital Planning and Grants Manager

 

Approved/Reviewed by:

Ramakrishna Pochiraju, Executive Director of Planning & Engineering

Fred Walls, Director of Procurement and Materials

Chris Andrichak, Chief Financial Officer

Jill A. Sprague, General Counsel/Chief Legal Officer