Report ID: 20-037   
Type: Regular - Operations
Meeting Body: Board of Directors - Regular Meeting
Meeting Date: 1/22/2020 Final action: 1/22/2020
Recommended Action: Consider receiving a report on wheel chair ramp/lift maintenance, operator pre-checks and how lift issues are managed including an analysis of the September 2019 road calls. [Requested by Director Shaw - 10/9/19]
Attachments: 1. STAFF REPORT, 2. Master Minute Order

TO:                                          AC Transit Board of Directors                                          

FROM:                                          Michael A. Hursh, General Manager

SUBJECT:                     Wheel Chair Ramp/Lift Maintenance                     

 

BRIEFING ITEM


RECOMMENDED ACTION(S):

 

Title

Consider receiving a report on wheel chair ramp/lift maintenance, operator pre‐checks and how lift issues are managed including an analysis of the September 2019 road calls. [Requested by Director Shaw - 10/9/19]

Body

 

STRATEGIC IMPORTANCE:

 

Goal - Safe and Secure Operations

Initiative - Service Quality

 

This briefing item provides road call performance and Operator pre-check data that will be used to enhance the District’s ability to deliver safe, reliable, and sustainable service.

 

BUDGETARY/FISCAL IMPACT:

 

There is no specific fiscal impact for this briefing item.

 

BACKGROUND/RATIONALE:

 

As requested by the Board, staff is presenting this briefing item on the wheelchair deployment analysis used to monitor pre-checks and improve road call failures.  The District experienced seven (7) wheelchair ramp/lift related road calls between report date August 31, 2019 to September 30, 2019.  Analysis found that four (4) of the road calls resulted in items lodged in the ramp drawer preventing operation, two (2) road calls had defective kneeler switches, and one (1) road call required a mechanical adjustment to the proxy sensor.

 

The following table details the road call incidents that includes time stamps on the division departure, road call, and wheelchair ramp/lift deployments to indicate if a pre-trip deployment was made. Based on the data, one (1) failure may have been preventable through Operator pre‐check depending on when the item was dropped and lodged in the ramp.

 

 

 

 

 

Ramp/Lift Incident Details

Date

Bus No.

Bus Pullout

Road Call

Ramp/Lift Deployed

Route ID

Reported Problem

Corrective Action

8/31

1330

05:52

13:27

05:50

51A

Ramp does not close

Cleaned debris and replaced sensor

 

 

 

 

08:14

 

 

 

8/31

1069

07:20

12:57

13:38

72R

Ramp stuck

Debris on the ramp preventing the ramp from fully closing

 

 

 

 

13:48

 

 

 

9/7

1511

06:28

09:05

06:26

14

Ramp stuck

Removed eye glasses from track

 

 

 

 

07:27

 

 

 

 

 

 

 

20:33

 

 

 

 

 

 

 

20:52

 

 

 

9/11

1437

09:05

16:30

10:06

14

Kneeler stuck

Fault in Kneel switch

 

 

 

 

10:10

 

 

 

 

 

 

 

10:37

 

 

 

 

 

 

 

12:47

 

 

 

 

 

 

 

12:57

 

 

 

 

 

 

 

18:57

 

 

 

9/17

1585

07:09

10:50

10:29

18

Bad Proximity switch

Adjusted front door sensor

 

 

 

 

10:37

 

 

 

 

 

 

 

11:43

 

 

 

9/21

1332

05:49

09:05

09:17

51A

Drawer will not close

Cleaned debris

 

 

 

 

09:59

 

 

 

9/28

1455

17:36

20:33

17:42

45

Kneeler not working

Fault in Kneel switch

 

 

 

 

20:38

 

 

 

 

The table above is an example of a new Lift Analysis Report being developed that will provide pertinent information to identify root causes of road calls and possible preventable measures to enhance performance and reliability of the equipment.  Division staff will use this report to validate if a proper pre-trip inspection was performed by the Operator. Division staff will also complete regular “gate” checks along with Road Supervision to verify that each Operator has deployed the ramp/lift during their normal bus pre-trip inspection.

 

ADVANTAGES/DISADVANTAGES:

 

There are no advantages or disadvantages associated with this report. It is intended to provide an update on strategic activities.

 

ALTERNATIVES ANALYSIS:

 

This report does not recommend an action; therefore, no alternatives analysis is presented.

 

PRIOR RELEVANT BOARD ACTION/POLICIES:

 

None                      

ATTACHMENTS:

 

None

 

Prepared by:

William Tonis, Director of Project Controls and Systems Analysis

 

Approved/Reviewed by:

Salvador Llamas, Chief Operating Officer

Cecil Blandon, Director of Maintenance

Derik Calhoun, Director of Transportation